WATTS dead level floor drain system
Continuous floor drain system
DECK DONATION TO A GREAT LOCAL NON PROFIT ORGANIZATIONS
We donated this deck to a local non profit organization that is helping keep kids off the streets and become a functional part of society.
CONCRETE SLAB/FOOTING SEAM REPAIRS
Small repairs made due to a new build shifting and settling. All these repairs were made with some great SIKA products. In the end these repairs stopped the undermining of the slab.
TEMPORARY ACID CONTAINMENT REPAIR
Temporary solution for a acid containment system that had failed due to frost movement. We were able to seal off compromised areas with a 3 part epoxy system to get the customer up and running.
SOLE PLATE CHEMICAL GROUTING
Removal of sole plates on a crushing unit, reinstall and place sole plates and re-grout. good for another 200 000 ounces!
LOADING DOCK REMOVAL AND REPLACE
Remove non functioning loading dock and install new one with new bollards. Another cold working atmosphere but once again Work Monster prevailed!
HARNOIS BUILDING OVER COOLING TOWER
Fabric building installed over cooling tower in Northern Ontario. Due to harsh temperatures they needed a quick solution to utilize there cooling tower. -40 all week but we managed to prevail and get them up and running.